MPO-referred Jun 24 2026; Building Canada Act listing decision targeted fall 2026; lifecycle cost est.
Build 2030–2035 at 55% construction value-added, then 7% of capex per year operating. Peak US$1.7B/yr · cumulative 2026–40 US$16B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 30 km | |
| Major highway | 317 km | |
| Transmission ≥230 kV | 383 km | |
| Pipeline | 214 km | |
| Port | Owen Sound | 974 km |
| Generating station | Brandon (260 MW) | 608 km |
| City >50k | Thunder Bay | 207 km |
| VIA Rail fleet — 313 cars (Thunder Bay) | Transportation | 212 km |
| PAK Lithium | Minerals & Metals | 227 km |
| Prairie Silica | Minerals & Metals | 360 km |
| Manitoba Renewable Fuel Production Facility | Clean Energy | 490 km |
| Ring of Fire (Juno Corp.) | Minerals & Metals | 508 km |
| Alto High-Speed Rail (Toronto–Québec City) | Advanced / FEED | US$44B – US$66B |
| Darlington New Nuclear (SMR ×4) | Under construction | US$15B |
| PowerCo (Volkswagen) Gigafactory | Under construction | US$5.1B |
| VIA Rail fleet — 313 cars (Thunder Bay) | Under construction | US$3.4B |
| Crawford Nickel | Advanced / FEED | US$2.0B |
| Via TWO (synthetic graphite) | Advanced / FEED | US$2.0B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register