Minerals & Metals · ON

Ring of Fire (Juno Corp.)

Summit deal plate

Gold + critical minerals discovery

At a glance

Proponent
Juno Corp.
Capex (as printed)
not disclosed
Capex (US$, midpoint)
not disclosed
Stage
Early / concept
Location
52.80°N, 86.30°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway290 km
Major highway712 km
Transmission ≥230 kV582 km
Pipeline530 km
PortChurchill825 km
Generating stationRobert-Bourassa (LG-2) (5,616 MW)582 km
City >50kThunder Bay528 km

Nearest other projects

Deep Geological Repository (Ignace)Power & Utilities508 km
PAK LithiumMinerals & Metals524 km
VIA Rail fleet — 313 cars (Thunder Bay)Transportation532 km
Crawford NickelMinerals & Metals589 km
Conawapa Hydro (revived)Power & Utilities595 km

Also in Ontario

Alto High-Speed Rail (Toronto–Québec City)Advanced / FEEDUS$44B – US$66B
Deep Geological Repository (Ignace)Feasibility / permittingUS$19B
Darlington New Nuclear (SMR ×4)Under constructionUS$15B
PowerCo (Volkswagen) GigafactoryUnder constructionUS$5.1B
VIA Rail fleet — 313 cars (Thunder Bay)Under constructionUS$3.4B
Crawford NickelAdvanced / FEEDUS$2.0B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register