High-purity silica, HHPE process
Build 2028–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$124M/yr · cumulative 2026–40 US$956M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 14 km | |
| Major highway | 92 km | |
| Transmission ≥230 kV | 33 km | |
| Pipeline | 55 km | |
| Port | Churchill | 1,020 km |
| Generating station | Brandon (260 MW) | 248 km |
| City >50k | Winnipeg | 52 km |
| Manitoba Renewable Fuel Production Facility | Clean Energy | 131 km |
| PAK Lithium | Minerals & Metals | 270 km |
| Deep Geological Repository (Ignace) | Power & Utilities | 360 km |
| Prairie Lithium | Minerals & Metals | 457 km |
| Boardwalk Lithium Brine | Minerals & Metals | 509 km |
| Port of Churchill Plus | Advanced / FEED | US$57B |
| Conawapa Hydro (revived) | Early / concept | US$13B – US$15B |
| Manitoba Renewable Fuel Production Facility | Advanced / FEED | US$1.4B |
| Minago Critical Minerals | Feasibility / permitting | US$1.0B |
| Thompson Nickel Mine | Under construction | US$200M |