Minerals & Metals · SK · #76 of 131 disclosed prospectus tickets

Boardwalk Lithium Brine

Summit deal plate

DLE; 10 ktpa modular

At a glance

Proponent
Kevin Piepgrass (proponent)
Capex (as printed)
US$600M
Capex (US$, midpoint)
US$600M
Stage
Feasibility / permitting
Location
49.20°N, 103.50°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2032 at 55% construction value-added, then 15% of capex per year operating. Peak US$110M/yr · cumulative 2026–40 US$1.0B.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway42 km
Major highway247 km
Transmission ≥230 kV38 km
Pipeline111 km
PortChurchill1,224 km
Generating stationBoundary Dam (incl. CCS) (672 MW)38 km
City >50kRegina160 km

Nearest other projects

Prairie LithiumMinerals & Metals52 km
Covenant Energy (renewable diesel + SAF)Clean Energy168 km
Project Titan (sulphate of potash)Minerals & Metals356 km
Manitoba Renewable Fuel Production FacilityClean Energy383 km
Canadian Uranium Conversion FacilityMinerals & Metals393 km

Also in Saskatchewan

Rook I UraniumUnder constructionUS$1.6B
Loki Flake GraphiteFeasibility / permittingUS$1.4B
PLS (Triple R) UraniumAdvanced / FEEDUS$1.2B
Prairie LithiumUnder constructionUS$881M
Covenant Energy (renewable diesel + SAF)Advanced / FEEDUS$653M
Project Titan (sulphate of potash)Shovel-readyUS$150M – US$900M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register