U₃O₈ → UF₆; first in 40+ yrs; site TBD
Build 2028–2030 at 55% construction value-added, then 15% of capex per year operating. Peak US$105M/yr · cumulative 2026–40 US$1.1B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 3 km | |
| Major highway | 5 km | |
| Transmission ≥230 kV | 0 km | |
| Pipeline | 95 km | |
| Port | Churchill | 1,081 km |
| Generating station | Boundary Dam (incl. CCS) (672 MW) | 424 km |
| City >50k | Saskatoon | 8 km |
| SRC Minerals-to-Magnet | Minerals & Metals | 9 km |
| Project Titan (sulphate of potash) | Minerals & Metals | 70 km |
| Covenant Energy (renewable diesel + SAF) | Clean Energy | 226 km |
| North Star Project (BECCS) | Clean Energy | 253 km |
| Canadian Showcase (diluent-free heavy oil upgrading) | Conventional Energy | 258 km |
| No other catalogued projects |