50 ktpa, 30-yr life; PEA
Build 2030–2032 at 55% construction value-added, then 15% of capex per year operating. Peak US$264M/yr · cumulative 2026–40 US$2.4B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 218 km | |
| Major highway | 390 km | |
| Transmission ≥230 kV | 309 km | |
| Pipeline | 456 km | |
| Port | Churchill | 747 km |
| Generating station | Grand Rapids (MB) (479 MW) | 449 km |
| City >50k | Saskatoon | 386 km |
| McIlvenna Bay Copper | Minerals & Metals | 174 km |
| Wheeler River Uranium | Minerals & Metals | 236 km |
| North Star Project (BECCS) | Clean Energy | 266 km |
| PLS (Triple R) Uranium | Minerals & Metals | 361 km |
| SRC Minerals-to-Magnet | Minerals & Metals | 387 km |
| Rook I Uranium | Under construction | US$1.6B |
| PLS (Triple R) Uranium | Advanced / FEED | US$1.2B |
| Prairie Lithium | Under construction | US$881M |
| Covenant Energy (renewable diesel + SAF) | Advanced / FEED | US$653M |
| Boardwalk Lithium Brine | Feasibility / permitting | US$600M |
| Project Titan (sulphate of potash) | Shovel-ready | US$150M – US$900M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register