MPO tranche 1; >50% built, production 2026
Build 2026–2027 at 55% construction value-added, then 15% of capex per year operating. Peak US$110M/yr · cumulative 2026–40 US$974M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 45 km | |
| Major highway | 408 km | |
| Transmission ≥230 kV | 144 km | |
| Pipeline | 498 km | |
| Port | Churchill | 668 km |
| Generating station | Grand Rapids (MB) (479 MW) | 278 km |
| City >50k | Saskatoon | 406 km |
| Loki Flake Graphite | Minerals & Metals | 174 km |
| Minago Critical Minerals | Minerals & Metals | 235 km |
| Thompson Nickel Mine | Minerals & Metals | 310 km |
| Wheeler River Uranium | Minerals & Metals | 358 km |
| North Star Project (BECCS) | Clean Energy | 389 km |
| Rook I Uranium | Under construction | US$1.6B |
| Loki Flake Graphite | Feasibility / permitting | US$1.4B |
| PLS (Triple R) Uranium | Advanced / FEED | US$1.2B |
| Prairie Lithium | Under construction | US$881M |
| Covenant Energy (renewable diesel + SAF) | Advanced / FEED | US$653M |
| Boardwalk Lithium Brine | Feasibility / permitting | US$600M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register