Phoenix ISR; first production mid-2028
Build 2026–2028 at 55% construction value-added, then 15% of capex per year operating. Peak US$92M/yr · cumulative 2026–40 US$1.1B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 276 km | |
| Major highway | 613 km | |
| Transmission ≥230 kV | 370 km | |
| Pipeline | 660 km | |
| Port | Churchill | 676 km |
| Generating station | Grand Rapids (MB) (479 MW) | 626 km |
| City >50k | Saskatoon | 608 km |
| PLS (Triple R) Uranium | Minerals & Metals | 229 km |
| Loki Flake Graphite | Minerals & Metals | 236 km |
| Rook I Uranium | Minerals & Metals | 246 km |
| McIlvenna Bay Copper | Minerals & Metals | 358 km |
| North Star Project (BECCS) | Clean Energy | 426 km |
| Rook I Uranium | Under construction | US$1.6B |
| Loki Flake Graphite | Feasibility / permitting | US$1.4B |
| PLS (Triple R) Uranium | Advanced / FEED | US$1.2B |
| Prairie Lithium | Under construction | US$881M |
| Covenant Energy (renewable diesel + SAF) | Advanced / FEED | US$653M |
| Boardwalk Lithium Brine | Feasibility / permitting | US$600M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register