210 MW with First Nations partnership; COD 2033
Build 2030–2032 at 55% construction value-added, then 8% of capex per year operating. Peak US$92M/yr · cumulative 2026–40 US$575M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 25 km | |
| Major highway | 530 km | |
| Transmission ≥230 kV | 80 km | |
| Pipeline | 28 km | |
| Port | Ocean Falls | 550 km |
| Generating station | Site C (1,100 MW) | 80 km |
| City >50k | Prince George | 203 km |
| Quintette Underground + Trend-Roman | Minerals & Metals | 56 km |
| Gold Creek Industrial Complex | Conventional Energy | 67 km |
| Wicheeda Rare Earth | Minerals & Metals | 112 km |
| BW Velora — Grande Prairie | Digital Technology | 156 km |
| Baptiste Nickel | Minerals & Metals | 240 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register