Large-scale nickel; EA Jan 2026
Build 2030–2033 at 55% construction value-added, then 15% of capex per year operating. Peak US$330M/yr · cumulative 2026–40 US$3.4B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 33 km | |
| Major highway | 575 km | |
| Transmission ≥230 kV | 84 km | |
| Pipeline | 102 km | |
| Port | Stewart | 335 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 201 km |
| City >50k | Prince George | 187 km |
| North Coast Transmission Line | Power & Utilities | 148 km |
| Berg Copper | Minerals & Metals | 177 km |
| Wicheeda Rare Earth | Minerals & Metals | 192 km |
| Sweetwater Wind Farm | Clean Energy | 240 km |
| Quintette Underground + Trend-Roman | Minerals & Metals | 242 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register