Cu-Mo-Ag; PFS 2026
Build 2030–2033 at 55% construction value-added, then 15% of capex per year operating. Peak US$510M/yr · cumulative 2026–40 US$5.2B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 65 km | |
| Major highway | 543 km | |
| Transmission ≥230 kV | 82 km | |
| Pipeline | 69 km | |
| Port | Ocean Falls | 177 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 374 km |
| City >50k | Prince George | 252 km |
| North Coast Transmission Line | Power & Utilities | 82 km |
| LNG Canada Phase 2 | Conventional Energy | 139 km |
| Baptiste Nickel | Minerals & Metals | 177 km |
| Prince Rupert E-Fuels | Clean Energy | 257 km |
| Ksi Lisims LNG + PRGT Pipeline | Conventional Energy | 270 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |
| Roberts Bank Terminal 2 | Advanced / FEED | US$2.6B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register