Transportation · BC · #25 of 131 disclosed prospectus tickets

Roberts Bank Terminal 2

Summit deal plate Fast-track list (MPO)

Container terminal; MPO-referred (C$ est.)

At a glance

Proponent
Vancouver Fraser Port Authority
Capex (as printed)
C$3.5B C$ source
Capex (US$, midpoint)
US$2.6B
Stage
Advanced / FEED
Location
49.02°N, 123.15°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2028–2031 at 55% construction value-added, then 5% of capex per year operating. Peak US$351M/yr · cumulative 2026–40 US$2.5B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway20 km
Major highway2 km
Transmission ≥230 kV27 km
Pipeline31 km
PortVancouver31 km
Generating stationRevelstoke (2,480 MW)419 km
City >50kVancouver28 km

Nearest other projects

West Coast Oil PipelineConventional Energy18 km
Kardium (medtech commercialization)Advanced Manufacturing29 km
Sterling Shipyards (bulk export terminal)Marine & Port33 km
H2 Gateway hydrogen liquefactionClean Energy34 km
Photonic — Vanguard Quantum Chip PlantDigital Technology39 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B