Atrial-fibrillation device scale-up
Build 2028–2029 at 55% construction value-added, then 12% of capex per year operating. Peak US$69M/yr · cumulative 2026–40 US$453M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 6 km | |
| Major highway | 1 km | |
| Transmission ≥230 kV | 7 km | |
| Pipeline | 2 km | |
| Port | Vancouver | 10 km |
| Generating station | Revelstoke (2,480 MW) | 393 km |
| City >50k | Vancouver | 13 km |
| Sterling Shipyards (bulk export terminal) | Marine & Port | 7 km |
| H2 Gateway hydrogen liquefaction | Clean Energy | 11 km |
| Photonic — Vanguard Quantum Chip Plant | Digital Technology | 11 km |
| Roberts Bank Terminal 2 | Transportation | 29 km |
| West Coast Oil Pipeline | Conventional Energy | 43 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register