~1,250 km Bruderheim → Roberts Bank (Delta), 1 Mbpd; C$35.2–43.7B; in-service 2032–34; front of the prospectus
Listed: Prospectus prints US$35B; Alberta's MPO submission says C$35.2–43.7B — the prospectus figure matches Alberta's low case, so the currency label is likely a quirk. C$ ranges anchored on the comparables under each bar.
Build 2032–2039 at 55% construction value-added, then 12% of capex per year operating. Peak US$2.4B/yr · cumulative 2026–40 US$21B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 25 km | |
| Major highway | 19 km | |
| Transmission ≥230 kV | 43 km | |
| Pipeline | 44 km | |
| Port | Vancouver | 41 km |
| Generating station | Revelstoke (2,480 MW) | 436 km |
| City >50k | Vancouver | 37 km |
| Roberts Bank Terminal 2 | Transportation | 18 km |
| Kardium (medtech commercialization) | Advanced Manufacturing | 43 km |
| H2 Gateway hydrogen liquefaction | Clean Energy | 44 km |
| Sterling Shipyards (bulk export terminal) | Marine & Port | 44 km |
| Photonic — Vanguard Quantum Chip Plant | Digital Technology | 54 km |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |
| Prairie Connector Pipeline | Advanced / FEED | US$2.1B |