Conventional Energy · AB→US · #29 of 131 disclosed prospectus tickets

Prairie Connector Pipeline

Summit deal plate

Hardisty → US border, 600k–1M bpd; FID mid-2027

At a glance

Proponent
Neil McCann (proponent)
Capex (as printed)
US$2.1B
Capex (US$, midpoint)
US$2.1B
Stage
Advanced / FEED
Location
52.67°N, 111.30°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location and corridor alignment.

Modelled GDP contribution Modelled

Build 2028–2031 at 55% construction value-added, then 12% of capex per year operating. Peak US$289M/yr · cumulative 2026–40 US$3.3B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway28 km
Major highway157 km
Transmission ≥230 kV174 km
Pipeline0 km
PortSquamish890 km
Generating stationGenesee (1,400 MW)214 km
City >50kRed Deer175 km

Nearest other projects

Vegreville Project (straw → SAF)Clean Energy105 km
Canadian Showcase (diluent-free heavy oil upgrading)Conventional Energy110 km
Alberta Critical Minerals Recovery & REE RefiningMinerals & Metals165 km
Clearwater (direct lithium extraction)Minerals & Metals165 km
Low-Carbon Synthetic Gasoline Facilities (×2)Conventional Energy169 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register