884 MW behind-the-meter data centre; largest digital ticket
Listed: C$14.5B in prospectus · 884 MW listed, "up to 1.2 GW" reported. C$ ranges anchored on the comparables under each bar.
Build 2028–2033 at 55% construction value-added, then 10% of capex per year operating. Peak US$1.1B/yr · cumulative 2026–40 US$13B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 7 km | |
| Major highway | 147 km | |
| Transmission ≥230 kV | 256 km | |
| Pipeline | 111 km | |
| Port | Vancouver | 887 km |
| Generating station | Travers Solar (465 MW) | 145 km |
| City >50k | Medicine Hat | 9 km |
| Canada's First Helium Liquefaction | Minerals & Metals | 126 km |
| East Calgary Carbon Sequestration Hub | Clean Energy | 224 km |
| Prairie Economic Gateway | Marine & Port | 245 km |
| Prairie Connector Pipeline | Conventional Energy | 290 km |
| Project Titan (sulphate of potash) | Minerals & Metals | 309 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |
| Prairie Connector Pipeline | Advanced / FEED | US$2.1B |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register