Minerals & Metals · SK · #129 of 131 disclosed prospectus tickets

Canada's First Helium Liquefaction

Summit deal plate

FEED complete; US$280M broader raise

At a glance

Proponent
Royal Helium
Capex (as printed)
US$100M
Capex (US$, midpoint)
US$100M
Stage
Shovel-ready
Location
49.30°N, 109.50°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2027–2028 at 55% construction value-added, then 15% of capex per year operating. Peak US$28M/yr · cumulative 2026–40 US$228M.

US$0MUS$10MUS$20MUS$30M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway68 km
Major highway179 km
Transmission ≥230 kV368 km
Pipeline98 km
PortVancouver983 km
Generating stationTravers Solar (465 MW)257 km
City >50kMedicine Hat118 km

Nearest other projects

BW Velora — Redcliff (Medicine Hat)Digital Technology126 km
Project Titan (sulphate of potash)Minerals & Metals302 km
East Calgary Carbon Sequestration HubClean Energy348 km
Canadian Uranium Conversion FacilityMinerals & Metals368 km
Prairie Economic GatewayMarine & Port369 km

Also in Saskatchewan

Rook I UraniumUnder constructionUS$1.6B
Loki Flake GraphiteFeasibility / permittingUS$1.4B
PLS (Triple R) UraniumAdvanced / FEEDUS$1.2B
Prairie LithiumUnder constructionUS$881M
Covenant Energy (renewable diesel + SAF)Advanced / FEEDUS$653M
Boardwalk Lithium BrineFeasibility / permittingUS$600M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register