16.2 Mt LCE resource; demonstration → permitting
Build 2030–2033 at 55% construction value-added, then 15% of capex per year operating. Peak US$371M/yr · cumulative 2026–40 US$3.8B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 5 km | |
| Major highway | 8 km | |
| Transmission ≥230 kV | 39 km | |
| Pipeline | 17 km | |
| Port | Squamish | 769 km |
| Generating station | Genesee (1,400 MW) | 49 km |
| City >50k | Edmonton | 40 km |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Conventional Energy | 49 km |
| Genesee Energy Campus | Clean Energy | 49 km |
| Gasia Homestead Diluent Recovery & Partial Upgrader | Conventional Energy | 62 km |
| Alberta Critical Minerals Recovery & REE Refining | Minerals & Metals | 68 km |
| Blue & Turquoise Hydrogen / Methanol Modular Plant | Conventional Energy | 71 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Prairie Connector Pipeline | Advanced / FEED | US$2.1B |