MPO tranche 2; construction 2026; C$139.5M CIB loan
Build 2026–2029 at 55% construction value-added, then 7% of capex per year operating. Peak US$602M/yr · cumulative 2026–40 US$5.6B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 14 km | |
| Major highway | 620 km | |
| Transmission ≥230 kV | 0 km | |
| Pipeline | 30 km | |
| Port | Ocean Falls | 243 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 348 km |
| City >50k | Prince George | 283 km |
| Berg Copper | Minerals & Metals | 82 km |
| LNG Canada Phase 2 | Conventional Energy | 124 km |
| Baptiste Nickel | Minerals & Metals | 148 km |
| Ksi Lisims LNG + PRGT Pipeline | Conventional Energy | 219 km |
| Prince Rupert E-Fuels | Clean Energy | 225 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |
| Roberts Bank Terminal 2 | Advanced / FEED | US$2.6B |