Clean Energy · NB/NS · #52 of 131 disclosed prospectus tickets

Atlantic Canada E-Fuels

Summit deal plate

E-methanol / e-SAF from biogenic carbon

At a glance

Proponent
Zachary Steele (proponent)
Capex (as printed)
US$1.0B
Capex (US$, midpoint)
US$1.0B
Stage
Early / concept
Location
46.10°N, 64.80°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2032–2034 at 55% construction value-added, then 8% of capex per year operating. Peak US$183M/yr · cumulative 2026–40 US$990M.

US$0MUS$50MUS$100MUS$150MUS$200M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway2 km
Major highway4 km
Transmission ≥230 kV0 km
Pipeline135 km
PortChatham116 km
Generating stationPoint Lepreau (660 MW)172 km
City >50kMoncton3 km

Nearest other projects

Eauclaire FORCE Tidal ArrayClean Energy87 km
Port Saint John OptimizationMarine & Port135 km
Beacon Data Centres — Spruce LakeDigital Technology144 km
Mactaquac Life Achievement ProjectPower & Utilities161 km
Enfield RTP Clean Fuel FacilityClean Energy163 km

Also in New Brunswick

Mactaquac Life Achievement ProjectAdvanced / FEEDUS$5.1B – US$6.6B
Beacon Data Centres — Spruce LakeAdvanced / FEEDUS$3.9B
Port of Belledune Iron-Ore TerminalEarly / conceptUS$1.5B
Sisson Tungsten-MolybdenumAdvanced / FEEDUS$600M
New Nuclear in New BrunswickAdvanced / FEEDnot disclosed
Port Saint John OptimizationAdvanced / FEEDnot disclosed

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register