Clean Energy · NB

New Nuclear in New Brunswick

Summit deal plate

Up to 1,500 MW at Point Lepreau site

At a glance

Proponent
NB Power
Capex (as printed)
not disclosed
Capex (US$, midpoint)
not disclosed
Stage
Advanced / FEED
Location
45.07°N, 66.45°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway31 km
Major highway88 km
Transmission ≥230 kV0 km
Pipeline38 km
PortSaint-John38 km
Generating stationPoint Lepreau (660 MW)0 km
City >50kSaint John37 km

Nearest other projects

Beacon Data Centres — Spruce LakeDigital Technology28 km
Port Saint John OptimizationMarine & Port38 km
Mactaquac Life Achievement ProjectPower & Utilities103 km
Sisson Tungsten-MolybdenumMinerals & Metals150 km
Eauclaire FORCE Tidal ArrayClean Energy164 km

Also in New Brunswick

Mactaquac Life Achievement ProjectAdvanced / FEEDUS$5.1B – US$6.6B
Beacon Data Centres — Spruce LakeAdvanced / FEEDUS$3.9B
Port of Belledune Iron-Ore TerminalEarly / conceptUS$1.5B
Atlantic Canada E-FuelsEarly / conceptUS$1.0B
Sisson Tungsten-MolybdenumAdvanced / FEEDUS$600M
Port Saint John OptimizationAdvanced / FEEDnot disclosed

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register