668 MW hydro life-extension to 100 yrs
Build 2028–2031 at 55% construction value-added, then 7% of capex per year operating. Peak US$804M/yr · cumulative 2026–40 US$6.7B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 19 km | |
| Major highway | 12 km | |
| Transmission ≥230 kV | 0 km | |
| Pipeline | 90 km | |
| Port | Saint-John | 99 km |
| Generating station | Point Lepreau (660 MW) | 103 km |
| City >50k | Fredericton | 18 km |
| Sisson Tungsten-Molybdenum | Minerals & Metals | 47 km |
| Beacon Data Centres — Spruce Lake | Digital Technology | 94 km |
| Port Saint John Optimization | Marine & Port | 98 km |
| New Nuclear in New Brunswick | Clean Energy | 103 km |
| Atlantic Canada E-Fuels | Clean Energy | 161 km |
| Beacon Data Centres — Spruce Lake | Advanced / FEED | US$3.9B |
| Port of Belledune Iron-Ore Terminal | Early / concept | US$1.5B |
| Atlantic Canada E-Fuels | Early / concept | US$1.0B |
| Sisson Tungsten-Molybdenum | Advanced / FEED | US$600M |
| New Nuclear in New Brunswick | Advanced / FEED | not disclosed |
| Port Saint John Optimization | Advanced / FEED | not disclosed |