MPO-referred
Build 2028–2030 at 55% construction value-added, then 15% of capex per year operating. Peak US$110M/yr · cumulative 2026–40 US$1.2B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 11 km | |
| Major highway | 49 km | |
| Transmission ≥230 kV | 47 km | |
| Pipeline | 133 km | |
| Port | Chatham | 143 km |
| Generating station | Point Lepreau (660 MW) | 150 km |
| City >50k | Fredericton | 55 km |
| Mactaquac Life Achievement Project | Power & Utilities | 47 km |
| Beacon Data Centres — Spruce Lake | Digital Technology | 139 km |
| Port Saint John Optimization | Marine & Port | 143 km |
| New Nuclear in New Brunswick | Clean Energy | 150 km |
| Atlantic Canada E-Fuels | Clean Energy | 175 km |
| Mactaquac Life Achievement Project | Advanced / FEED | US$5.1B – US$6.6B |
| Beacon Data Centres — Spruce Lake | Advanced / FEED | US$3.9B |
| Port of Belledune Iron-Ore Terminal | Early / concept | US$1.5B |
| Atlantic Canada E-Fuels | Early / concept | US$1.0B |
| New Nuclear in New Brunswick | Advanced / FEED | not disclosed |
| Port Saint John Optimization | Advanced / FEED | not disclosed |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register