Marine & Port · NB · #40 of 131 disclosed prospectus tickets

Port of Belledune Iron-Ore Terminal

Summit deal plate

Phase 1 US$250M; Phase 2 US$1.24B

At a glance

Proponent
Belledune Port Authority
Capex (as printed)
US$1.5B
Capex (US$, midpoint)
US$1.5B
Stage
Early / concept
Location
47.90°N, 65.85°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2032–2034 at 55% construction value-added, then 6% of capex per year operating. Peak US$273M/yr · cumulative 2026–40 US$1.3B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway12 km
Major highway211 km
Transmission ≥230 kV215 km
Pipeline293 km
PortBelledune0 km
Generating stationPoint Lepreau (660 MW)318 km
City >50kMoncton218 km

Nearest other projects

Sisson Tungsten-MolybdenumMinerals & Metals195 km
Atlantic Canada E-FuelsClean Energy215 km
Mactaquac Life Achievement ProjectPower & Utilities230 km
Port Saint John OptimizationMarine & Port293 km
Beacon Data Centres — Spruce LakeDigital Technology296 km

Also in New Brunswick

Mactaquac Life Achievement ProjectAdvanced / FEEDUS$5.1B – US$6.6B
Beacon Data Centres — Spruce LakeAdvanced / FEEDUS$3.9B
Atlantic Canada E-FuelsEarly / conceptUS$1.0B
Sisson Tungsten-MolybdenumAdvanced / FEEDUS$600M
New Nuclear in New BrunswickAdvanced / FEEDnot disclosed
Port Saint John OptimizationAdvanced / FEEDnot disclosed

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register