Wrigley → Inuvik all-season road; MPO-referred Mar 2026; Building Canada Act listing decision targeted fall 2026
No disclosed capex.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 651 km | |
| Major highway | 519 km | |
| Transmission ≥230 kV | 994 km | |
| Pipeline | 835 km | |
| Port | Tuktoyaktuk | 444 km |
| Generating station | W.A.C. Bennett (2,876 MW) | 1,140 km |
| City >50k | Prince George | 1,360 km |
| MacTung Tungsten | Minerals & Metals | 288 km |
| Arctic Economic & Security Corridor | Transportation | 408 km |
| Kudz Ze Kayah | Minerals & Metals | 498 km |
| Prairie Creek Silver-Zinc (PC Silver) | Minerals & Metals | 508 km |
| Minto Copper/Gold/Silver (restart) | Minerals & Metals | 549 km |
| Nechalacho Basal Rare Earth | Feasibility / permitting | US$2.1B |
| Pine Point Zinc-Lead | Feasibility / permitting | US$2.0B |
| NICO Cobalt-Gold-Bismuth-Copper | Advanced / FEED | US$720M |
| Prairie Creek Silver-Zinc (PC Silver) | Shovel-ready | US$350M |
| Yellowknife Lithium + Conversion | Feasibility / permitting | US$259M |
| Arctic Economic & Security Corridor | Early / concept | not disclosed |