30 ktpa lithium carbonate conversion
Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$71M/yr · cumulative 2026–40 US$473M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 186 km | |
| Major highway | 979 km | |
| Transmission ≥230 kV | 661 km | |
| Pipeline | 627 km | |
| Port | Tuktoyaktuk | 1,146 km |
| Generating station | Site C (1,100 MW) | 801 km |
| City >50k | Edmonton | 995 km |
| Nechalacho Basal Rare Earth | Minerals & Metals | 85 km |
| Pine Point Zinc-Lead | Minerals & Metals | 185 km |
| NICO Cobalt-Gold-Bismuth-Copper | Minerals & Metals | 191 km |
| Taltson Hydro Expansion | Power & Utilities | 264 km |
| Arctic Economic & Security Corridor | Transportation | 405 km |
| Nechalacho Basal Rare Earth | Feasibility / permitting | US$2.1B |
| Pine Point Zinc-Lead | Feasibility / permitting | US$2.0B |
| NICO Cobalt-Gold-Bismuth-Copper | Advanced / FEED | US$720M |
| Prairie Creek Silver-Zinc (PC Silver) | Shovel-ready | US$350M |
| Mackenzie Valley Highway | Advanced / FEED | not disclosed |
| Arctic Economic & Security Corridor | Early / concept | not disclosed |