Minerals & Metals · YT

MacTung Tungsten

Summit deal plate

US DPA award; feasibility Q1 2027

At a glance

Proponent
Fireweed Metals
Capex (as printed)
not disclosed
Capex (US$, midpoint)
not disclosed
Stage
Feasibility / permitting
Location
63.30°N, 130.20°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway383 km
Major highway429 km
Transmission ≥230 kV712 km
Pipeline642 km
PortTuktoyaktuk693 km
Generating stationW.A.C. Bennett (2,876 MW)924 km
City >50kPrince George1,127 km

Nearest other projects

Kudz Ze KayahMinerals & Metals212 km
Mackenzie Valley HighwayTransportation288 km
Prairie Creek Silver-Zinc (PC Silver)Minerals & Metals339 km
Minto Copper/Gold/Silver (restart)Minerals & Metals365 km
Casino Copper-GoldMinerals & Metals439 km

Also in Yukon

Casino Copper-GoldFeasibility / permittingUS$2.9B
Coffee GoldAdvanced / FEEDUS$718M
Kudz Ze KayahAdvanced / FEEDUS$492M
Minto Copper/Gold/Silver (restart)Feasibility / permittingUS$200M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register