Power & Utilities · ON

Bruce C

Summit deal plate

Up to 4,800 MW new nuclear

At a glance

Proponent
Bruce Power
Capex (as printed)
not disclosed
Capex (US$, midpoint)
not disclosed
Stage
Early / concept
Location
44.33°N, 81.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

No disclosed capex.

No disclosed capex — excluded from the GDP model.

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway130 km
Major highway123 km
Transmission ≥230 kV0 km
Pipeline164 km
PortOwen Sound60 km
Generating stationBruce A/B (6,550 MW)0 km
City >50kKitchener132 km

Nearest other projects

Via TWO (synthetic graphite)Minerals & Metals160 km
10 GW Integrated Gigafactory CampusClean Energy172 km
PowerCo (Volkswagen) GigafactoryAdvanced Manufacturing175 km
Vianode Synthetic Graphite PlantAdvanced Manufacturing179 km
Xanadu — Large-Scale Quantum MachineDigital Technology192 km

Also in Ontario

Alto High-Speed Rail (Toronto–Québec City)Advanced / FEEDUS$44B – US$66B
Deep Geological Repository (Ignace)Feasibility / permittingUS$19B
Darlington New Nuclear (SMR ×4)Under constructionUS$15B
PowerCo (Volkswagen) GigafactoryUnder constructionUS$5.1B
VIA Rail fleet — 313 cars (Thunder Bay)Under constructionUS$3.4B
Crawford NickelAdvanced / FEEDUS$2.0B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register