190 koz/yr; fully permitted
Build 2027–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$140M/yr · cumulative 2026–40 US$1.6B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 57 km | |
| Major highway | 282 km | |
| Transmission ≥230 kV | 76 km | |
| Pipeline | 58 km | |
| Port | Squamish | 396 km |
| Generating station | Mica (2,805 MW) | 229 km |
| City >50k | Prince George | 121 km |
| Spanish Mountain Gold | Minerals & Metals | 56 km |
| Wicheeda Rare Earth | Minerals & Metals | 169 km |
| Yellowhead Copper | Minerals & Metals | 209 km |
| Quintette Underground + Trend-Roman | Minerals & Metals | 213 km |
| Northern Spruce (pulp-mill BECCS) | Clean Energy | 265 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |