Minerals & Metals · BC · #114 of 131 disclosed prospectus tickets

Western Canada Single Super Phosphate

Summit deal plate

Granular phosphate fertilizer; PEA

At a glance

Proponent
Daniel Gleeson (proponent)
Capex (as printed)
US$200M
Capex (US$, midpoint)
US$200M
Stage
Feasibility / permitting
Location
49.50°N, 115.06°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$55M/yr · cumulative 2026–40 US$365M.

US$0MUS$20MUS$40MUS$60M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway5 km
Major highway179 km
Transmission ≥230 kV186 km
Pipeline186 km
PortVancouver580 km
Generating stationKootenay Canal / Seven Mile (1,400 MW)166 km
City >50kLethbridge162 km

Nearest other projects

East Calgary Carbon Sequestration HubClean Energy196 km
Prairie Economic GatewayMarine & Port198 km
Deep Sky One (direct air capture)Clean Energy292 km
BW Velora — Redcliff (Medicine Hat)Digital Technology314 km
Calgary–Edmonton High-Speed RailTransportation324 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register