Clean Energy · AB · #99 of 131 disclosed prospectus tickets

Deep Sky One (direct air capture)

Summit deal plate

500 kt CO₂/yr DAC; FEED

At a glance

Proponent
Deep Sky
Capex (as printed)
US$328M
Capex (US$, midpoint)
US$328M
Stage
Advanced / FEED
Location
52.03°N, 113.95°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 8% of capex per year operating. Peak US$90M/yr · cumulative 2026–40 US$456M.

US$0MUS$50M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway39 km
Major highway9 km
Transmission ≥230 kV32 km
Pipeline109 km
PortSquamish697 km
Generating stationShepard Energy Centre (860 MW)120 km
City >50kRed Deer28 km

Nearest other projects

Calgary–Edmonton High-Speed RailTransportation32 km
Prairie Economic GatewayMarine & Port104 km
East Calgary Carbon Sequestration HubClean Energy117 km
Clearwater (direct lithium extraction)Minerals & Metals132 km
Genesee Energy CampusClean Energy146 km

Also in Alberta

West Coast Oil PipelineEarly / conceptUS$35B
BW Velora — Redcliff (Medicine Hat)Advanced / FEEDUS$11B
Calgary–Edmonton High-Speed RailEarly / conceptUS$8.0B
Low-Carbon Synthetic Gasoline Facilities (×2)Advanced / FEEDUS$6.0B – US$7.0B
Genesee Energy CampusAdvanced / FEEDUS$2.0B – US$6.0B
Clearwater (direct lithium extraction)Feasibility / permittingUS$2.5B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register