Digital Technology · ON · #75 of 131 disclosed prospectus tickets

Xanadu — Quantum Manufacturing Facility

Summit deal plate

Federal commitment C$195M

At a glance

Proponent
Xanadu
Capex (as printed)
C$893M C$ source
Capex (US$, midpoint)
US$652M
Stage
Advanced / FEED
Location
43.70°N, 79.35°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 10% of capex per year operating. Peak US$120M/yr · cumulative 2026–40 US$978M.

US$0MUS$50MUS$100M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway5 km
Major highway10 km
Transmission ≥230 kV7 km
Pipeline4 km
PortHamilton64 km
Generating stationPickering (3,100 MW)26 km
City >50kToronto5 km

Nearest other projects

Xanadu — Large-Scale Quantum MachineDigital Technology7 km
Darlington New Nuclear (SMR ×4)Power & Utilities54 km
10 GW Integrated Gigafactory CampusClean Energy69 km
Vianode Synthetic Graphite PlantAdvanced Manufacturing180 km
PowerCo (Volkswagen) GigafactoryAdvanced Manufacturing181 km

Also in Ontario

Alto High-Speed Rail (Toronto–Québec City)Advanced / FEEDUS$44B – US$66B
Deep Geological Repository (Ignace)Feasibility / permittingUS$19B
Darlington New Nuclear (SMR ×4)Under constructionUS$15B
PowerCo (Volkswagen) GigafactoryUnder constructionUS$5.1B
VIA Rail fleet — 313 cars (Thunder Bay)Under constructionUS$3.4B
Crawford NickelAdvanced / FEEDUS$2.0B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register