Hydro + solar on a former gold mine
Build 2032–2033 at 55% construction value-added, then 8% of capex per year operating. Peak US$124M/yr · cumulative 2026–40 US$482M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 41 km | |
| Major highway | 44 km | |
| Transmission ≥230 kV | 195 km | |
| Pipeline | 252 km | |
| Port | Halifax | 66 km |
| Generating station | Halifax / Tufts Cove (350 MW) | 66 km |
| City >50k | Halifax | 68 km |
| ScotiaPort | Marine & Port | 16 km |
| 15 Mile Processing Hub | Minerals & Metals | 22 km |
| Scotia Mine (zinc-lead) | Minerals & Metals | 34 km |
| Nova Scotia Grid Infrastructure (2×300 MW) | Clean Energy | 50 km |
| Enfield RTP Clean Fuel Facility | Clean Energy | 51 km |
| Wind West | Early / concept | US$44B |
| Nova Scotia Renewable Energy Park | Advanced / FEED | US$4.5B |
| Nova Scotia Grid Infrastructure (2×300 MW) | Advanced / FEED | US$1.2B |
| Novaporte | Advanced / FEED | US$1.0B |
| Melford International Terminal | Shovel-ready | US$357M |
| Trenton Energy Storage | Advanced / FEED | US$275M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register