Minerals & Metals · NS · #112 of 131 disclosed prospectus tickets

15 Mile Processing Hub

Summit deal plate

Six open pits, central mill; 100 koz/yr

At a glance

Proponent
Dustin O'Leary (proponent)
Capex (as printed)
US$202M
Capex (US$, midpoint)
US$202M
Stage
Feasibility / permitting
Location
45.00°N, 62.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2031 at 55% construction value-added, then 15% of capex per year operating. Peak US$56M/yr · cumulative 2026–40 US$369M.

US$0MUS$20MUS$40MUS$60M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway49 km
Major highway61 km
Transmission ≥230 kV210 km
Pipeline273 km
PortPictou75 km
Generating stationHalifax / Tufts Cove (350 MW)87 km
City >50kHalifax88 km

Nearest other projects

Touquoy Mine Renewable Energy HubClean Energy22 km
ScotiaPortMarine & Port33 km
Scotia Mine (zinc-lead)Minerals & Metals55 km
Trenton Energy StorageClean Energy69 km
Nova Scotia Grid Infrastructure (2×300 MW)Clean Energy72 km

Also in Nova Scotia

Wind WestEarly / conceptUS$44B
Nova Scotia Renewable Energy ParkAdvanced / FEEDUS$4.5B
Nova Scotia Grid Infrastructure (2×300 MW)Advanced / FEEDUS$1.2B
NovaporteAdvanced / FEEDUS$1.0B
Touquoy Mine Renewable Energy HubEarly / conceptUS$450M
Melford International TerminalShovel-readyUS$357M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register