Marine & Port · NS · #54 of 131 disclosed prospectus tickets

Novaporte

Summit deal plate

Rail rehab, Coast Guard homeport, offshore-wind base; seeks private credit

At a glance

Proponent
Novaporte / Sydney Harbour
Capex (as printed)
US$1.0B
Capex (US$, midpoint)
US$1.0B
Stage
Advanced / FEED
Location
46.15°N, 60.20°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 6% of capex per year operating. Peak US$183M/yr · cumulative 2026–40 US$1.1B.

US$0MUS$50MUS$100MUS$150MUS$200M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway6 km
Major highway4 km
Transmission ≥230 kV9 km
Pipeline465 km
PortSydney1 km
Generating stationLingan (620 MW)16 km
City >50kHalifax313 km

Nearest other projects

Point Tupper Green HydrogenClean Energy108 km
Melford International TerminalMarine & Port110 km
Nova Scotia Spaceport (Canso)Advanced Manufacturing110 km
Nova Scotia Renewable Energy ParkClean Energy154 km
Goldboro GoldMinerals & Metals160 km

Also in Nova Scotia

Wind WestEarly / conceptUS$44B
Nova Scotia Renewable Energy ParkAdvanced / FEEDUS$4.5B
Nova Scotia Grid Infrastructure (2×300 MW)Advanced / FEEDUS$1.2B
Touquoy Mine Renewable Energy HubEarly / conceptUS$450M
Melford International TerminalShovel-readyUS$357M
Trenton Energy StorageAdvanced / FEEDUS$275M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register