Contrecœur Container Terminal

Context — not in prospectus Fast-track list (MPO)

MPO tranche 1

At a glance

Proponent
Montreal Port Authority / DP World
Capex (as printed)
C$2.3B C$ source
Capex (US$, midpoint)
US$1.7B
Stage
Advanced / FEED
Location
45.85°N, 73.25°W
Summit deal plate
No — context project (not in the investor prospectus)
Fast-track list
Yes — referred to the Major Projects Office
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 6% of capex per year operating. Peak US$308M/yr · cumulative 2026–40 US$1.9B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway37 km
Major highway4 km
Transmission ≥230 kV43 km
Pipeline43 km
PortSorel24 km
Generating stationBeauharnois (1,900 MW)79 km
City >50kMontréal47 km

Nearest other projects

Alto High-Speed Rail (Toronto–Québec City)Transportation47 km
Courant Project (H₂ + hydro for ammonium nitrate)Clean Energy79 km
Bécancour Battery Material PlantMinerals & Metals82 km
LFP Cathode Active Materials PlantClean Energy86 km
Projet MauricieClean Energy87 km

Also in Quebec

Kino Aski LNG (cross-Canada to Québec port)Early / conceptUS$23B
Projet MauricieAdvanced / FEEDUS$3.0B
Strange Lake Rare EarthsFeasibility / permittingUS$2.2B
Courant Project (H₂ + hydro for ammonium nitrate)Advanced / FEEDUS$1.8B – US$2.1B
Matawinie Graphite MineAdvanced / FEEDUS$1.3B
Port of Québec ModernizationAdvanced / FEEDUS$1.2B