Clean Energy · QC · #35 of 131 disclosed prospectus tickets

Courant Project (H₂ + hydro for ammonium nitrate)

Summit deal plate

480 kt/yr ammonium nitrate; FEED

At a glance

Proponent
Pietro Di Zanno (proponent)
Capex (as printed)
US$1.8B – US$2.1B
Capex (US$, midpoint)
US$1.8B – US$2.1B
Stage
Advanced / FEED
Location
46.40°N, 72.60°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 8% of capex per year operating. Peak US$358M/yr · cumulative 2026–40 US$2.6B.

US$0MUS$100MUS$200MUS$300M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway35 km
Major highway5 km
Transmission ≥230 kV45 km
Pipeline122 km
PortTrois-Rivieres (Three Rivers)9 km
Generating stationBeauharnois (1,900 MW)158 km
City >50kTrois-Rivières7 km

Nearest other projects

Bécancour Battery Material PlantMinerals & Metals14 km
LFP Cathode Active Materials PlantClean Energy16 km
Bécancour Cobalt FacilityMinerals & Metals19 km
Projet MauricieClean Energy20 km
Contrecœur Container TerminalMarine & Port79 km

Also in Quebec

Kino Aski LNG (cross-Canada to Québec port)Early / conceptUS$23B
Projet MauricieAdvanced / FEEDUS$3.0B
Strange Lake Rare EarthsFeasibility / permittingUS$2.2B
Contrecœur Container TerminalAdvanced / FEEDUS$1.7B
Matawinie Graphite MineAdvanced / FEEDUS$1.3B
Port of Québec ModernizationAdvanced / FEEDUS$1.2B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register