Marine & Port · NL · #118 of 131 disclosed prospectus tickets

Bull Arm Industrial Marine Centre

Summit deal plate

Floating dry dock; heavy-lift repair

At a glance

Proponent
Karen O'Neill (proponent)
Capex (as printed)
US$180M – US$220M
Capex (US$, midpoint)
US$180M – US$220M
Stage
Advanced / FEED
Location
47.75°N, 53.85°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 6% of capex per year operating. Peak US$55M/yr · cumulative 2026–40 US$236M.

US$0MUS$20MUS$40MUS$60M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway9 km
Major highway9 km
Transmission ≥230 kV76 km
Pipeline973 km
PortClarenville47 km
Generating stationHolyrood (490 MW)68 km
City >50kSt. John's89 km

Nearest other projects

Leif Erikson Trans-Atlantic FibreDigital Technology81 km
Project Oqwatn (St. John's Dockyard)Marine & Port88 km
Bay d'Espoir Hydro UpgradeClean Energy148 km
EVREC Green Energy HubClean Energy190 km
Green Bay Copper-GoldMinerals & Metals290 km

Also in Newfoundland and Labrador

Churchill Falls / Gull Island HydroAdvanced / FEEDUS$37B
EVREC Green Energy HubAdvanced / FEEDUS$11B
North Atlantic Green Energy HubAdvanced / FEEDUS$5.1B
Kami Iron OreFeasibility / permittingUS$3.0B
Bay d'Espoir Hydro UpgradeFeasibility / permittingUS$1.1B
Project Oqwatn (St. John's Dockyard)Advanced / FEEDUS$750M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register