9 Mt/yr DR-grade pellet feed
Build 2030–2033 at 55% construction value-added, then 15% of capex per year operating. Peak US$446M/yr · cumulative 2026–40 US$4.5B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 11 km | |
| Major highway | 587 km | |
| Transmission ≥230 kV | 100 km | |
| Pipeline | 846 km | |
| Port | Goose Bay | 448 km |
| Generating station | Churchill Falls (5,428 MW) | 214 km |
| City >50k | Chicoutimi | 568 km |
| Scully Manganese Sulphate | Minerals & Metals | 12 km |
| Lac Knife Graphite | Minerals & Metals | 15 km |
| Churchill Falls / Gull Island Hydro | Power & Utilities | 213 km |
| Shaakichiuwaanaan (Li-Ta-Cs) | Minerals & Metals | 276 km |
| Strange Lake Rare Earths | Minerals & Metals | 425 km |
| Churchill Falls / Gull Island Hydro | Advanced / FEED | US$37B |
| EVREC Green Energy Hub | Advanced / FEED | US$11B |
| North Atlantic Green Energy Hub | Advanced / FEED | US$5.1B |
| Bay d'Espoir Hydro Upgrade | Feasibility / permitting | US$1.1B |
| Project Oqwatn (St. John's Dockyard) | Advanced / FEED | US$750M |
| Scully Manganese Sulphate | Feasibility / permitting | US$600M |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register