Marine & Port · NL · #66 of 131 disclosed prospectus tickets

Project Oqwatn (St. John's Dockyard)

Summit deal plate

Canada's largest ship-repair facility

At a glance

Proponent
Sean Leet (proponent)
Capex (as printed)
US$750M
Capex (US$, midpoint)
US$750M
Stage
Advanced / FEED
Location
47.57°N, 52.70°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2030 at 55% construction value-added, then 6% of capex per year operating. Peak US$138M/yr · cumulative 2026–40 US$840M.

US$0MUS$50MUS$100MUS$150M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway2 km
Major highway3 km
Transmission ≥230 kV17 km
Pipeline1,054 km
PortSaint-John's1 km
Generating stationHolyrood (490 MW)36 km
City >50kSt. John's2 km

Nearest other projects

Leif Erikson Trans-Atlantic FibreDigital Technology24 km
Bull Arm Industrial Marine CentreMarine & Port88 km
Bay d'Espoir Hydro UpgradeClean Energy236 km
EVREC Green Energy HubClean Energy262 km
Green Bay Copper-GoldMinerals & Metals360 km

Also in Newfoundland and Labrador

Churchill Falls / Gull Island HydroAdvanced / FEEDUS$37B
EVREC Green Energy HubAdvanced / FEEDUS$11B
North Atlantic Green Energy HubAdvanced / FEEDUS$5.1B
Kami Iron OreFeasibility / permittingUS$3.0B
Bay d'Espoir Hydro UpgradeFeasibility / permittingUS$1.1B
Scully Manganese SulphateFeasibility / permittingUS$600M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register