Clean Energy · NL · #7 of 131 disclosed prospectus tickets

EVREC Green Energy Hub

Summit deal plate

Green hydrogen + renewable ammonia, Botwood; FEED

At a glance

Proponent
Abraxas Power / EDF Power Solutions
Capex (as printed)
US$11B
Capex (US$, midpoint)
US$11B
Stage
Advanced / FEED
Location
49.14°N, 55.35°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2033 at 55% construction value-added, then 8% of capex per year operating. Peak US$972M/yr · cumulative 2026–40 US$11B.

US$0MUS$500MUS$1.0B2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway16 km
Major highway14 km
Transmission ≥230 kV72 km
Pipeline915 km
PortSpringdale65 km
Generating stationBay d'Espoir (613 MW)133 km
City >50kSt. John's262 km

Nearest other projects

Green Bay Copper-GoldMinerals & Metals100 km
Bay d'Espoir Hydro UpgradeClean Energy133 km
Bull Arm Industrial Marine CentreMarine & Port190 km
North Atlantic Green Energy HubClean Energy247 km
Project Oqwatn (St. John's Dockyard)Marine & Port262 km

Also in Newfoundland and Labrador

Churchill Falls / Gull Island HydroAdvanced / FEEDUS$37B
North Atlantic Green Energy HubAdvanced / FEEDUS$5.1B
Kami Iron OreFeasibility / permittingUS$3.0B
Bay d'Espoir Hydro UpgradeFeasibility / permittingUS$1.1B
Project Oqwatn (St. John's Dockyard)Advanced / FEEDUS$750M
Scully Manganese SulphateFeasibility / permittingUS$600M

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register