Minerals & Metals · BC · #61 of 131 disclosed prospectus tickets

North Island Copper-Gold-Mo

Summit deal plate

Pre-feasibility Q4 2026

At a glance

Proponent
Northisle Copper & Gold
Capex (as printed)
US$846M
Capex (US$, midpoint)
US$846M
Stage
Feasibility / permitting
Location
50.60°N, 127.30°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2030–2032 at 55% construction value-added, then 15% of capex per year operating. Peak US$155M/yr · cumulative 2026–40 US$1.4B.

US$0MUS$50MUS$100MUS$150M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway193 km
Major highway318 km
Transmission ≥230 kV351 km
Pipeline345 km
PortPort Hardy19 km
Generating stationMica (2,805 MW)626 km
City >50kNanaimo290 km

Nearest other projects

Port Alberni Transshipment Hub (PATH)Marine & Port234 km
Woodfibre LNG ExpansionConventional Energy310 km
West Coast Oil PipelineConventional Energy332 km
H2 Gateway hydrogen liquefactionClean Energy336 km
Sterling Shipyards (bulk export terminal)Marine & Port340 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B