Primary magnesium; 8 ktpa Phase 2
Build 2028–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$38M/yr · cumulative 2026–40 US$295M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 41 km | |
| Major highway | 25 km | |
| Transmission ≥230 kV | 51 km | |
| Pipeline | 132 km | |
| Port | Trois-Rivieres (Three Rivers) | 79 km |
| Generating station | Beauharnois (1,900 MW) | 162 km |
| City >50k | Sherbrooke | 41 km |
| LFP Cathode Active Materials Plant | Clean Energy | 74 km |
| Bécancour Battery Material Plant | Minerals & Metals | 74 km |
| Bécancour Cobalt Facility | Minerals & Metals | 74 km |
| Courant Project (H₂ + hydro for ammonium nitrate) | Clean Energy | 87 km |
| Contrecœur Container Terminal | Marine & Port | 103 km |
| Kino Aski LNG (cross-Canada to Québec port) | Early / concept | US$23B |
| Projet Mauricie | Advanced / FEED | US$3.0B |
| Strange Lake Rare Earths | Feasibility / permitting | US$2.2B |
| Courant Project (H₂ + hydro for ammonium nitrate) | Advanced / FEED | US$1.8B – US$2.1B |
| Contrecœur Container Terminal | Advanced / FEED | US$1.7B |
| Matawinie Graphite Mine | Advanced / FEED | US$1.3B |