496 MW with 30-yr BC Hydro PPA
Build 2028–2030 at 55% construction value-added, then 8% of capex per year operating. Peak US$257M/yr · cumulative 2026–40 US$1.8B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 33 km | |
| Major highway | 3 km | |
| Transmission ≥230 kV | 72 km | |
| Pipeline | 72 km | |
| Port | Squamish | 176 km |
| Generating station | Revelstoke (2,480 MW) | 212 km |
| City >50k | Kamloops | 71 km |
| Photonic — Vanguard Quantum Chip Plant | Digital Technology | 170 km |
| Woodfibre LNG Expansion | Conventional Energy | 178 km |
| Kardium (medtech commercialization) | Advanced Manufacturing | 181 km |
| Sterling Shipyards (bulk export terminal) | Marine & Port | 182 km |
| H2 Gateway hydrogen liquefaction | Clean Energy | 184 km |
| Ksi Lisims LNG + PRGT Pipeline | Shovel-ready | US$29B |
| LNG Canada Phase 2 | Advanced / FEED | US$24B |
| Woodfibre LNG Expansion | Early / concept | US$9.9B |
| North Coast Transmission Line | Under construction | US$4.4B |
| Berg Copper | Feasibility / permitting | US$3.4B |
| Prince Rupert E-Fuels | Early / concept | US$1.3B – US$5.3B |