1,200 km corridor from Manitoba grid; 150 MW + broadband
Build 2028–2031 at 55% construction value-added, then 7% of capex per year operating. Peak US$468M/yr · cumulative 2026–40 US$3.9B.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 462 km | |
| Major highway | 1,464 km | |
| Transmission ≥230 kV | 733 km | |
| Pipeline | 1,456 km | |
| Port | Churchill | 462 km |
| Generating station | Limestone (1,340 MW) | 709 km |
| City >50k | Saskatoon | 1,461 km |
| True North Gold | Minerals & Metals | 255 km |
| Port of Churchill Plus | Marine & Port | 462 km |
| Conawapa Hydro (revived) | Power & Utilities | 702 km |
| Thompson Nickel Mine | Minerals & Metals | 850 km |
| Wheeler River Uranium | Minerals & Metals | 936 km |
| Grays Bay Road and Port | Advanced / FEED | US$850M |
| Qik Port (Qikiqtarjuaq) | Shovel-ready | US$350M |
| True North Gold | Shovel-ready | US$42M |
| Iqaluit Nukkiksautiit Hydro | Early / concept | not disclosed |
Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register