New Polaris (gold-antimony)

Summit deal plate

100 koz Au; 500–600 tpa antimony

At a glance

Proponent
Canagold Resources
Capex (as printed)
US$200M
Capex (US$, midpoint)
US$200M
Stage
Advanced / FEED
Location
58.70°N, 133.40°W
Summit deal plate
Yes — in the 167-project prospectus pitched Sept 14–15 2026
Fast-track list
No MPO referral on record
Project location.

Modelled GDP contribution Modelled

Build 2028–2029 at 55% construction value-added, then 15% of capex per year operating. Peak US$55M/yr · cumulative 2026–40 US$425M.

US$0MUS$20MUS$40MUS$60M2026203020352040

Connectivity · nearest existing infrastructure

Straight-line distance from the project point to the nearest vertex of each network layer.

Railway138 km
Major highway654 km
Transmission ≥230 kV272 km
Pipeline599 km
PortStewart370 km
Generating stationW.A.C. Bennett (2,876 MW)734 km
City >50kPrince George843 km

Nearest other projects

Red Chris Mine ExpansionMinerals & Metals238 km
Kudz Ze KayahMinerals & Metals341 km
Red Mountain & Premier GoldMinerals & Metals371 km
Lawyers-Ranch Gold-SilverMinerals & Metals392 km
Ksi Lisims LNG + PRGT PipelineConventional Energy467 km

Also in British Columbia

Ksi Lisims LNG + PRGT PipelineShovel-readyUS$29B
LNG Canada Phase 2Advanced / FEEDUS$24B
Woodfibre LNG ExpansionEarly / conceptUS$9.9B
North Coast Transmission LineUnder constructionUS$4.4B
Berg CopperFeasibility / permittingUS$3.4B
Prince Rupert E-FuelsEarly / conceptUS$1.3B – US$5.3B

Open on the Dealbook map · Open the Infrastructure Atlas · Back to the register