Small-scale LNG, proprietary tech; US$60M stage 1
Build 2027–2028 at 55% construction value-added, then 12% of capex per year operating. Peak US$43M/yr · cumulative 2026–40 US$299M.
Straight-line distance from the project point to the nearest vertex of each network layer.
| Railway | 15 km | |
| Major highway | 73 km | |
| Transmission ≥230 kV | 90 km | |
| Pipeline | 90 km | |
| Port | Squamish | 810 km |
| Generating station | Genesee (1,400 MW) | 110 km |
| City >50k | Edmonton | 89 km |
| The Alberta Project (forestry residuals → RNG) | Clean Energy | 67 km |
| Gasia Homestead Diluent Recovery & Partial Upgrader | Conventional Energy | 85 km |
| Blue & Turquoise Hydrogen / Methanol Modular Plant | Conventional Energy | 85 km |
| Alberta Industrial Heartland 1.0 (waste-to-energy + CCS) | Clean Energy | 86 km |
| Alberta Critical Minerals Recovery & REE Refining | Minerals & Metals | 90 km |
| West Coast Oil Pipeline | Early / concept | US$35B |
| BW Velora — Redcliff (Medicine Hat) | Advanced / FEED | US$11B |
| Calgary–Edmonton High-Speed Rail | Early / concept | US$8.0B |
| Low-Carbon Synthetic Gasoline Facilities (×2) | Advanced / FEED | US$6.0B – US$7.0B |
| Genesee Energy Campus | Advanced / FEED | US$2.0B – US$6.0B |
| Clearwater (direct lithium extraction) | Feasibility / permitting | US$2.5B |